Cost Estimating Worksheet

Cost ItemRough EstimateBid 1Bid 2Bid 3Final BidActual Cost+ or -
Clearing Land
Excavation and Gravel
Well
Septic
Permits and Insurance
Survey
Plans and Engineering
Foundation, Labor and Materials
Subfloor, Labor
Subfloor, Materials
Log Walls, Labor
Log Walls, Materials
Roof, Labor
Roof, Beams and Purlins
Roof, Shingles,Felt,Ply,T&G,Insulation
T&G Loft Floor
Crane/Operator
Plumbing, Labor
Plumbing, Materials
Electric, Labor
Electric, Temporary
Electric, Materials
Phone
HVAC,Labor and Materials
Windows
Doors, Exterior
Interior Wall Framing, Labor and Materials
Interior T&G, Labor and Materials
Drywall, Labor and Materials
Stairs, Interior and Exterior, Labor and Materials
Doors, Interior
Trim
Cabinetry
Floor Covering
Appliances
Tool Rental/Purchase
Paint/Stain, Materials and Labor
Hardware
Gutters
Decking, Labor and Materials
Tax
Freight
Subtotal
Cost of Package